Sithe Global Teramo Project The
Sithe Global Italia ("SGI") project is a 1000 MW combined
cycle, natural gas fueled power plant located in the city of Teramo
in the region of Abruzzo, Italy. The project site is located adjacent
to a new 345 kV substation owned by the transmission company Terna
and a high pressure gas pipeline owned by a subsidiary of Edison,
Spa. The highly efficient power facility will provide significant
support to the Italy’s electric network which is in need of
new capacity to replace old outdated facilities and to satisfy the
energy demands of the growing Italian economy.
The project is configured with two 330 MW advanced technology
combustion turbines, two heat recovery steam generators and a
350 MW steam turbine.
The project will use an air cooled condenser which will reduce
water consumption by 90% compared to traditional wet cooling systems.
Cooling
of the combustion turbine inlets along with supplementary firing
of the heat recovery steam generators will provide high efficiency
and
output over a broad range of ambient conditions.
By utilizing the most advanced combustion turbine technology including
a new "dry low NOx" combustion system, the project will
be amongst the cleanest and most efficient power plants in Europe.
The close proximity of the electrical substation and gas pipeline
will maximize the use of existing infrastructure and minimize the
impacts to the surrounding area. The plant is designed to set new
standards of efficiency, reliability and emissions control that
will result in a highly competitive project that will contribute
to the
advancement of the recently deregulated electricity market in Italy.
Benefits to the surrounding community
The project will require an investment of hundreds of millions
of euros in the region of Abruzzo providing many direct and indirect
economic benefits to the community and to the Italian economy.
During
the three year construction period the project will provide hundreds
of skilled construction jobs peaking at nearly 1000 during the
most active periods. The project will infuse millions of euros
into the
local economy through procurement of goods and services during
construction, thus creating and supporting many more local jobs.
After construction
the plant will be operated by a highly skilled staff of 35 to
45 people with an annual payroll exceeding 3 million euro. In
addition, millions
of euros per year will be spent locally for goods and services
to support the operation of the plant.
The project will greatly increase the tax base of the city of
Teramo and other surrounding communities by contributing millions
of euros
per year. The project will encourage new industrial development
in the area by providing reliable and competitively priced electricity
to the region. Sithe Global is proud to bring this important investment
to the Abruzzo community and looks forward to actively supporting
community affairs and charitable programs.
|